Introduction
The Legacy System Migration Workbench (LSMW) is a instrument to transmit data from legacy systems into an R/3 System. LSMW supports a step-by-step process; if one step is executed and saved then next step automatically follows. Apart from formation of project/ subproject/ object and recording, there are 14 basic steps included in LSMW. This article explains clearly about each and every step.
Example, I am showing how to upload Personnel Data for an employee i.e. Infotype 0002 .

Creating Project/ Subproject and Object:

Go to LSMW
Give the name of the Project, Subproject and Object as desired
1.png

Recording:
In menu bar, Goto---->Recordings
2.png
Now, Select ‘Recordings’ and create ---->Give recording name and description

3.png
Go to Transaction ‘PA30’
4.png
In Master data maintain screen, give Personnel No, infotype and subtype (if any), and click on create
5.png
Select The fields in whioch you want to input the data.
6.png
Save the Entry . The following screen will appear.
7.png

Now, click on Default All and save and press back
We are clicking ‘Default all’ button, so that all the fields which we touched during recording are included
8.png

9.png
Save and back to main Screen.

Processing basic steps in LSMW:
LSMW need to be configured 14 basic steps. Below you will find detailed step-by step procedure.
Click On execute
10.png

Step 1: Maintain Object Attributes
Select this radio button and click on execute

11.png
Now, click on Display/ Change icon Here, we are telling system that what kind recording should take into consideration while performing upload.

Select ‘Batch Input Recording’ and give name as shown below (Recording Name)
12.png
Save and Back.

Step 2: Maintain Source Structures
Source structures are helpful in building hierarchical relationships. While uploading the data system always checks highest level structure first before going for subordinate structure.

Select source structure and create
13.png
First click on Change button and then click on create button.
14.png
Save and Back.


Step 3: Maintain Source Fields
Here we assign all the fields which need to upload to source structure.
  Click on Object Overview---->select table
15.png
Click on Object Overview---->select table
Click on change and then select the source field and then Table.
16.png
Copy the fields and length in excel sheet (for temporary)
Note: exclude TABNAME and TCODE which are not required to maintain separately, system will take these from recording we made.

17.png
18.png
Save and back.

Step 4: Maintain Structure Relations
Here we check whether structure relations between legacy and R/3 established or not.
In this step there is no need to change, just save and come back.
19.png
20.png
Save and Back.

Step 5: Display Field Mapping and Conversion
Here we establish the relationship between legacy and R/3 based on object fields.
In menu bar, go to ExtrasàAuto Field Mapping
21.png
After Execute go to Extra and then Auto Field Mapping.
22.png
23.png
Now accept proposal for all the fields which need to upload

Step 6: Maintain Fixed Values, Translations, User-Defined Routines

No need to maintain this step, unless and until if there exist any user defined routines, which helpful for reusable.


Step 7: Specify Files
In this step, you specify the location of the legacy file.
Note: Generally we receive legacy file in excel format, so save this file as Text
Now, double click on ‘Legacy Data – On the PC (Front End)

24.png